Miami River, North Fork

The draw of the FDOT Railroad Bridge, mile 5.3 at Miami, shall open on signal if at least 48-hour notice is given to CSX System Operating Headquarters (800) 232-0144. (Revised: February 13, 2004)

Back to Bridge Regulations Index